Camber Calculation The Camber can be Calculated by two methods:- 1. By Auto Level Met…
Granular Sub-base: G.S.B - It is the layer which is used after the embankment const…
Dowel Bar or Tie Bar Dowel Bar : These bar are used in Highway Construction in Rigid …
The radius of Curve will be charged at every point. It will start before superelevati…
A Pothole is a depression in a road surface, usually asphalt pavement where traffic …
Toe Width is the bottom width of an Highway which is constructed in Embankment. How to…
Slope : It is the portion of ground which tends Upside to Downside in uniform way is…
When we are going for long drives or travelling by road for some kilometer we saw kilo…
The portions of the formation width on either side of carriageway are known as road s…
It is the area of road acquired for road construction and for its future development a…
Road Geometrics mean fixing all the dimensions of road we read more about road Roa…
Road Alignment The route along which the center line of a road is located in the plan…
HIGHWAY ENGINEERING The branch of transportation engineering with deals with the…
CEMENT CONCRETE ROADS The road having their wearing surface consisting of cement slab…
Functions of various components of road pavements The fo llowing are the components …
Road Pavement : A layered structure supported by the sub-grade soil to form the carri…
Prime Coat : Prime Coat is a application of Low viscosity bitumen over a granular bas…
Bed Calculate volume of soil = L x B x H. …
Horizontal curves :- There are four type of horizontal curves (a) Simp…