LEVEL SHEET IN LEVELING
|
Ch. |
Offset |
B.S |
I.S |
F.S |
H.I |
A.R.L |
D.R.L |
Remark |
|
0+10 |
|
|
|
|
|
|
|
|
|
0+20 |
|
|
|
|
|
|
|
|
|
0+30 |
|
|
|
|
|
|
|
|
|
0+40 |
|
|
|
|
|
|
|
|
|
0+50 |
|
|
|
|
|
|
|
|
|
0+60 |
|
|
|
|
|
|
|
|
Chainage = it is the marking on road.
Here 0+10 in this 0 is Kilometer 10 is Meter.
offset =it is the distance from
chainage in transverse direction
B.S = Back Sight it is the first staff reading after setting
the instrument
I.S = Intermediate Sight it is the reading after taking after Back
sight
F.S = Fore Sight it is the last
staff reading before changing the instrument
H.I = Height of Instrument it
is the height of instrument from MSL (mean sea level)
A.R.L = Achieved Road Level or Actual
Road Level
D.R.L
= Design
Road Level it is the top level of road
Remark is the note to remember things